Team Briefing  ·  WiBiz

Fri 1 May 2026

What was delivered today  ·  Your assignments for tomorrow

Delivered Today
Fritzie — Heavy Platform Deployment, Multi-Feature Sprint
Fritzie delivered across at least 7 distinct tasks in a single shift: QA audit fixes across multiple platform tabs (Resources visibility, Gate states, avatar updates, character limits, cert scores, name validation, page titles), Platform Guides tutorial URL fixes, Vertical Field addition to Provision Client with all 18 existing accounts updated, HSKD Cert Scenarios modal upgraded with Question Type and Vertical fields (DB schema changes, deployed and verified live), Onboarding Payload Tester, CCPA cookie banner compliance update with opt-out functionality, and project root cleanup removing 107+ temporary files. Every item has before/after documentation. Deployed to production. This is the strongest single-shift output in the data window by a wide margin.
Reena — Agent Portal Videos and Vertical Builds Completed
Per Thursday meeting notes, Reena finished Loom tutorial videos for the auto sales agent portal and completed Harbor Point and Ember & Oak vertical builds (landing pages, workflows, chatbots). Bot connection issues encountered and resolved. Nick requested MP4 files via WhatsApp. Awaiting Aileen's verification on the verticals.
Marinelle — Summit Estate Vertical Completed
Per Thursday meeting notes, Marinelle completed the real estate vertical build including resolving a chat widget connection issue independently. QA assignment pending from Aileen.
Chielo — Article CSS and Vertical Timeline Tracking Assigned and Acknowledged
Thursday meeting assigned Chielo to fix article CSS (max-width container, center alignment) and compile vertical completion timings with delay causes. These are acknowledged in meeting notes. Execution evidence is not yet visible but the tasks were assigned same-day.
Tomorrow's Assignments
Juliana
1 May is a public holiday. DementiaHub HSKD Tier 0 monitoring: if Juliana is the designated monitor, two bot checks must be completed and timestamped in the DementiaHub thread. If not designated, Nick must name someone else before 9AM. Additionally: the PropFunded influencer payment verification summary (8 influencers, 3/6 reels verified, view counts with timestamps) must be submitted to Nick by first working hour Monday 4 May at latest.
Critical
Aileen
Holiday — no standard tasks. But Beeva landing page preemption is now 4 days overdue against the weekly plan. First working hour Monday: Beeva landing page must be live on Vercel with sub-account connected, or a written status explaining what blocked it.
Critical
Lexine
Holiday — no standard tasks. Monday first priority: PropFunded referral tracking documentation (how referrals are tracked, counted, rewards calculated) must be a completed written document, not a work-in-progress. Second priority: Meat & Eat Zalo business account application status update with next steps and expected timeline.
Critical
Gershom
Holiday — no standard tasks. Monday: PropFunded soft breach workflow production status report — is it running clean, any errors in the last 7 days, trigger log screenshot. This was due Monday 28 Apr and has not been confirmed.
Critical
ADK
Holiday — no standard tasks. Monday: EOD compliance is mandatory. If ADK has active assignments, they must be listed with status. If ADK has no assignments, Nick must clarify ADK's role for the week.
High
Kimberly
Holiday — no standard tasks. Monday: Apex Links proposal must be reviewed with notes ready for Nick's introduction email to Thiru. PropFunded chatbot (support/FAQ scope) needs a progress update. AOM status — is it started?
High
Macy
Holiday — no standard tasks. Monday: Actual test scrape results from Studio N Marcus shared to Nick. Not a framework. Not a scoring model. Raw scrape output from a small region (Johor or Mindanao as discussed) so Nick can evaluate data quality.
High
Chielo
Holiday — no standard tasks. Monday: Article CSS fix deployed (max-width container, center alignment) and vertical completion timeline document with delay causes for all 5 builds submitted.
High
Fritzie
Holiday — no standard tasks. Monday: Add vertical-specific scenarios for each of the 6 verticals in HSKD Cert Scenarios (next action from Thursday's deployment). Update /privacy-policy page with CCPA-specific language at the #ccpa anchor.
Normal
Reena
Holiday — no standard tasks. Monday: Deliver agent portal tutorial videos as MP4 files to Nick via WhatsApp (not Loom links). Confirm Harbor Point and Ember & Oak verticals are QA-ready and chase Aileen for verification.
Normal
Marinelle
Holiday — no standard tasks. Monday: Execute QA on assigned verticals per Aileen's QA docs (if generated). If QA docs have not been issued by Aileen, escalate to Nick by 3PM.
Normal
Amor
Holiday — no standard tasks. Monday: Serenity Wellness Spa vertical must be fully complete — data storage, logic, email templates, all QA-ready. No partial status. Execute QA on assigned verticals if Aileen has issued docs.
Normal