Team Briefing  ·  WiBiz

Mon 11 May 2026

What was delivered today  ·  Your assignments for tomorrow

Delivered Today
No Proof-Backed Completions This Window
This report covers Sunday into Monday 3AM. Sunday is not a working day. The weekly plan was posted/revised but no deliverables were due or submitted. Monday is Day 1 of the sprint. Catalysts will be evaluated against Monday's deliverables in the next 3AM run.
Tomorrow's Assignments
Nick
Post all six decisions in #team-updates before 2PM: (1) William Marpa skills/hours/tasks, (2) Neithan role/hours/reporting, (3) Meat & Eat follow-up commitment, (4) Vamp update, (5) Beeva onboarding doc status, (6) SRC findings list confirmed for Chielo. Without these, four downstream team members are blocked.
Critical
Aileen
Post DementiaHub remediation plan as a shared Google Doc in #active-builds by 6PM. Must contain: every v1.1 audit finding, severity rating, fix description, owner (Aileen or Eujan), target day. The four-agent safety pipeline (A/B/C/D) must be scoped as individual line items. Confirm Eujan has repo access and N8N access in the same post.
Critical
Eujan
Post in #active-builds by EOD: (1) written summary of your understanding of what needs to be fixed in DementiaHub, (2) list of items you will own, (3) N8N instance URL with confirmed access. If blocked on access, post the blocker by 3PM so Aileen can resolve same-day.
Critical
Chielo
Post two deliverables: (1) SRC audit findings brief in #active-builds by 4PM with owner assignments for Amor and Fritzie, (2) Overdue billing audit raw findings table in #team-updates by 5PM showing per-client plan tier, actual usage, and unbilled overage amount.
Critical
Macy
Begin Arcads video production. Post in #team-updates by EOD: number of credits consumed today, number of videos produced, and production plan for remaining credits through Thursday.
High
ADK
Post 99YSG Instagram bio update (booking link + Free Kopi & Fruit promo) as a screenshot in #active-builds. Begin Arcads video batch. Post credit consumption count by EOD.
High
Kimberly
Post PropFunded AI build progress update in #active-builds by EOD. Include: what was built today, what Ann Canoy delivered, and blockers if any.
High
Ann Canoy
Post PropFunded AI support work completed today in #active-builds or daily log by EOD. Specific tasks and outputs, not summaries.
High
Brix
Clone repos for start.wibiz.ai, scale360.wibiz.ai, wibiz.ai, and autosales.wibiz.ai. Post in #active-builds: (1) confirmation of repo access for all four, (2) one-paragraph current-state audit of each site (what is live, what is broken).
High
Chris
Same as Brix. Clone all four repos, confirm access, post current-state audit of each site by EOD in #active-builds.
High
Amor
After receiving Chielo's SRC brief (due 4PM), begin SRC audit fixes. Post in daily log by 11PM: which SRC items were started, which BC360 showcase fixes were applied, and any blockers.
Normal
Fritzie
After receiving Chielo's SRC brief (due 4PM), begin assigned SRC audit fixes. Post in daily log by 11PM: items completed with links or screenshots.
Normal
Marinelle
Post BC360 vertical showcase content updates in daily log by 11PM. Specify which showcases (Harbor Point, Ember & Oak, Serenity Spa, Summit Ridge) received content and what was delivered.
Normal