Team Briefing · WiBiz
Wed 13 May 2026
What was delivered today · Your assignments for tomorrow
Delivered Today
Fritzie — WiBiz Universe Rebuild With Substantive Features
Fritzie delivered four concrete features for the WiBiz Universe rebuild based on audit findings: admin status cards with clickable filters, client Universe Profile card with HSKD/market/plan metadata, provision auto-routing that sets HSKD Required and Market Edition based on vertical selection, and backend persistence for hskdRequired and marketEdition. These are specific, functional, and directly traceable to the audit. Shift 7:31PM to 12:02AM, within hours. Solid output.
Kimberly — PropFunded AI Proposal + Email Fix + KOL Contracts
Kimberly delivered a PropFunded AI automation expansion report and proposal (Google Drive link provided), fixed unsubscribe buttons on PFA email templates, and updated/sent KOL contracts. Three distinct deliverables, two with verifiable outputs. Shift ran 1:17PM to 11:57PM, nearly 11 hours. Overperforming on hours and output.
Ann Canoy — PropFunded KOL Operations Ramping
Ann completed KOL transaction hash sending (trained by Kim), sent wallet address to Abishek for collaboration exit, followed up with unsigned KOL contracts, updated KOL tracker, sent contracts to 2 new KOLs, and handled support tickets. This is her fifth working day and she is executing operational KOL management tasks independently. Positive ramp signal.
Neithan — Website Responsive Fixes Across 4 Sites
Neithan audited and fixed mobile responsiveness, header enhancements, and UI issues across Fundable360, Legacy360, Media360, and Share360. Detailed breakdown of fix categories provided. First week, executing website tasks that align with the Brix/Chris website builds track. Productive.
Tomorrow's Assignments
Aileen
Post the DementiaHub remediation Google Doc link in #active-builds by 3PM Wednesday. The doc must list every v1.1 audit finding with columns: Finding, Severity, Fix Description, Owner (Aileen or Eujan), Target Day. No further delay is acceptable. If this does not exist by 3PM, Nick assumes direct oversight of DementiaHub remediation.
Critical
Eujan
Post in #active-builds by 6PM Wednesday: (1) confirmation you have accessed and reviewed the DementiaHub repo, (2) list of which remediation items you own, (3) N8N instance URL with access confirmed. If Aileen has not briefed you, state that explicitly so Nick can intervene.
Critical
Chielo
Post the overdue billing audit raw findings table in #team-updates by 3PM Wednesday. Per-client breakdown: plan tier, actual usage, overage charges incurred, total unbilled amount. This was due Tuesday. No further substitution with other tasks.
Critical
Macy
Post in #active-builds by 9PM Wednesday: (1) 99YSG end-to-end bot test results (screenshots of reply flow + promo trigger), (2) Arcads video batch output with credit count consumed. Both are overdue.
Critical
ADK
Post in #active-builds by 9PM Wednesday: (1) 99YSG Instagram bio updated with booking link and Free Kopi & Fruit promo (screenshot), (2) Arcads video batch with credit count consumed. File a complete EOD with task descriptions, not a truncated timestamp.
Critical
Amor
Post in #active-builds by 11PM Wednesday: SRC audit fix items completed (list which findings resolved, with screenshots). If Chielo has not provided the SRC brief, state that explicitly so it can be escalated.
High
Marinelle
Post in #active-builds by 11PM Wednesday: BC360 vertical showcase content updates completed (which showcases, what was changed, screenshots). Reference Chielo's QA checklist.
High
Kimberly
Post in #active-builds by 9PM Wednesday: (1) Apexlynx status update — was a response sent to Thiru's concern about per-program fees? If not, draft and send. (2) PropFunded proposal — confirm whether Nick/team has reviewed and next steps.
High
Ann Canoy
Post in PropFunded thread by 11PM Wednesday: updated KOL tracker screenshot showing contract status for all active KOLs (signed/unsigned/wallet received/payment sent). Confirm all unsigned KOLs have been followed up.
Normal
Fritzie
Post by midnight Wednesday: WiBiz Universe rebuild — next feature batch completed (identify from audit what remains) with screenshots showing functional state. Continue the momentum from Tuesday.
Normal
Neithan
Post by 9PM Wednesday: next batch of website fixes — identify which of the remaining sites (start.wibiz.ai, scale360.wibiz.ai, wibiz.ai, autosales.wibiz.ai) need responsive/UI work and begin. Screenshot before/after for at least one site.
Normal