Team Briefing  ·  WiBiz

Wed 27 May 2026

What was delivered today  ·  Your assignments for tomorrow

Delivered Today
Neithan — Master Portal Stripe Checkout + Webhook Integration Shipped
Refactored the Master Partner Portal checkout to use Stripe for data collection, removed Forge integration (preserved in git), connected the CRM inbound webhook, and configured a client creation notification workflow. Live URL posted: master-onboarding.wibiz.ai. This is a tangible, proof-backed deliverable that unblocks the Scale360 billing path. Shift ran 1PM to 11:05PM.
Aileen — SRI Build Takeover and Railway Deployment
Aileen deployed the WAIPA build to Railway (waipa-production.up.railway.app), propagating custom domain waipa.wibiz.ai, added Nick and others to GitHub and Railway. Fast response to Nick's thread directive. Nick subsequently identified the deployed repo was Aileen's fork (static MVP) rather than the production backend, which Aileen then pivoted to. Also delivered demo.wibiz.ai on branded subdomain and updated start.wibiz.ai design. Multiple deliverables across SRI, demo, and branding.
JC (slothfulkun) — Apexlynx Platform Fully Configured for QA
Posted the live site (apexlynx.wibiz.ai), confirmed all 6 email workflows are published and wired in Railway, and delivered a full QA guide covering login, booking flow, email notifications, edge cases, and all 6 portals. Demo credentials pre-seeded. This is a complete, testable build handoff.
Maxx — SRI CRM Configuration Work
Created WhatsApp templates, calendar booking (WAIPA Viewings), edited workflows, updated contact custom fields and opportunity fields. Links to live CRM locations provided. Worked an extended shift (3:42PM to 3:24AM). Webhook workflow integrations remain a blocker but progress is real and documented.
ADK — Actionable Showroom Video Feedback + Video Delivered
Gave specific, useful feedback on Nick's showroom video (zoom effect cropping, scroll speed, voiceover offer). Delivered a revised video by 8:25PM. Responded to a direct CEO request with substance, not filler.
Chris/Fritzie/Marinelle — DementiaHub Demo Collaboration (Partial)
The team coordinated a three-POV dry run video approach (Admin/Staff/Caregiver) with AI voiceover instead of a live demo. This is a good strategic decision. Execution failed on delivery (empty folder) but the collaborative approach and initiative are noted.
Tomorrow's Assignments
Chris
DementiaHub: (1) Fix Google Drive folder permissions and confirm Nick can access the dry run videos. (2) Post the V5 safety pipeline audit score with terminal output or screenshot evidence to #active-builds. Both by EOD. No excuses on the audit — it is now three days overdue.
Critical
Amor
SRI: Complete Vercel deploy with env vars and point waipa.wibiz.ai CNAME. Post Vercel deployment URL to #active-builds. If blocked on Clerk vars, escalate to Nick with the specific var names needed by 3PM. Also: post Neon DB schema confirmation (screenshot of table list) if DB setup is assigned to you.
Critical
Chielo
Deliver the final corrected overage billing sheet with amounts owed per client. This was the Wednesday deadline from the weekly plan. Post the completed spreadsheet link to #team-updates by EOD. No further extensions.
Critical
Kimberly
PropFunded newsletter final draft delivered to #active-builds for Macy QA. Link to the actual email draft, not a meeting summary. This is now three days overdue.
High
Ann
Post updated KOL tracker link with 3 new KOLs and list of outstanding unsigned contracts to #active-builds. Also: deliver the 99YSG social media campaign proposal draft. Both were due Monday.
High
Neithan
Explicitly confirm in #active-builds whether the 401 blocker on custom fields (locations.customValues.write, contacts.write) is resolved by the Stripe refactor or still open. If still open, post findings and escalation request. One clear status message.
High
Aileen
SRI: Confirm whether Railway deploy 43587d91 completed successfully. If Clerk env vars are still missing, flag Nick with the exact var names. Post production endpoint status check (5 routes: /api/webhooks/ghl, /api/agents/provision, /api/jobs/process, /agent/dashboard, /admin/dashboard) to #active-builds.
High
Maxx
SRI: Continue workflow builds. Post screenshots of completed workflows to #active-builds. Escalate webhook integration blocker formally in thread with specific technical detail so it can be resolved.
Normal
Macy
Melbourne campaign: confirm DNS status for mel.wibiz.ai and post screenshot. QA the PropFunded newsletter draft once Kimberly delivers. Post at least one QA artifact to #active-builds.
Normal
ADK
Confirm final brand kit (Logo A SVG/PNG light+dark, hex palette, typography, usage PDF) is posted to shared Drive and linked in #team-updates. If already delivered Monday, post the link again for team visibility.
Normal
JC
File an EOD in #daily-log. Monitor the Apexlynx QA thread for tester feedback and address any bugs reported. Post status update to #active-builds.
Normal
Fritzie
Confirm DementiaHub dry run videos are accessible in the shared Drive folder. File an EOD. If WiBiz Universe dashboard work is assigned, post progress.
High
Marinelle
Confirm DementiaHub dry run videos are accessible in the shared Drive folder. File an EOD.
High
Reena
File an EOD with specific tasks completed. If no tasks were assigned, flag that to Chielo or Nick by 3PM so work can be allocated.
Normal