Team Briefing · WiBiz
Thu 4 Jun 2026
What was delivered today · Your assignments for tomorrow
Delivered Today
Neithan — Heavy Output Across Master Portal and BC360 AutoSales
Neithan filed a detailed EOD documenting bug fixes (Closed Won webhook sync, commission-lead linking, /join referral URL handling), infrastructure builds (Cloudflare R2, admin lead stage override, commissions filter bar with CSV export, time range toggles on monitoring dashboards, Lead Detail Drawer), PDF/DOCX extraction fixes, 6 new NIM model integrations, and permission mode system (Ask/Accept/Plan/Auto/Bypass). Worked 1 PM to 2:57 AM. This is a 14-hour shift with concrete, verifiable output across multiple systems. Strongest individual contribution today.
Kimberly — BOGO Campaign Approved and Ready for Launch
BOGO campaign workflow built, demoed to PFA team, subject lines refined with team, final approval secured from Ms Leen. Campaign scheduled to go live Thursday. Telegram access for PFA support also configured. Clear deliverables with client sign-off.
ADK — Showroom Video Delivered
ADK posted a reworked showroom video at 8:25 PM in #feedback after Nick shared assets and direction. Responded to Nick's request same day with specific, actionable feedback on the original video (zoom effect, scroll speed, voiceover suggestions) before producing the deliverable.
Nick — Security Audit on Master Portal Completed
Nick personally ran and documented a security/P0 hardening review on the Master Portal codebase, identified a real auth-bypass, closed a demo super_admin fail-open, verified 6 backward-compatible fixes, and wrote SECURITY-P0-REVIEW.md. Posted full findings and awaits Aileen's review. Also continued WAIPA build work including W11.
Tomorrow's Assignments
Juliana
Post DementiaHub SG 4-agent triage verification status to #active-builds with evidence of current build state. If triage is not built, document what is missing. This is Tier 0 HSKD and has had zero updates all week.
Critical
Aileen
Post AgentOS status (live or not, with URL or blocker explanation) and fix agent/ops portal sign-in errors on WAIPA. Both confirmed in writing to #active-builds by 5 PM.
Critical
Chielo
Resolve WAIPA-SRI sub-account access for Neithan with written confirmation in #urgent-blockers. Post Malaysia Corp Sec transfer status to Nick. Both by 3 PM.
Critical
Macy
Post Malaysia Corp Sec / MECD signup status to Nick by 3 PM. If not started, state why and provide a revised timeline.
Critical
Neithan
Address Hudson Townsend's three Loom video issues (onboarding packet, calendar holidays, agency partner view) with a triage response in BC360 #general-chat confirming which are fixable this sprint and which need scoping.
High
Kimberly
Confirm BOGO campaign launched successfully. Post AI Living / The Meridian status update to #active-builds. Both by EOD.
High
ADK
Deliver final showroom video with intro, voiceover, and CTA based on Nick's asset directory. Post to #feedback by EOD.
Normal
Fritzie
Post NVidia environment completion confirmation with test access results to #wins. If not complete, list exactly what remains and ETA.
High
Lexine
File an EOD and confirm current assignment status. If no active assignment exists, escalate to Nick for reallocation.
High