Team Briefing · WiBiz
Fri 12 Jun 2026
What was delivered today · Your assignments for tomorrow
Delivered Today
Beeva Data Arriving — Melvin Posted WooCommerce CSV and Driver List
Melvin (Beeva client) posted product information from WooCommerce export in CSV format and a driver list with sub-zone lookups in the Beeva observer channel today. Kim acknowledged receipt and redirected to the resources channel. Nick followed up with the operational brief and Command Centre document. Melvin confirmed he will review this week. This is forward movement on the hard-gate item, though completeness of all four data items needs verification.
Aileen — BC360 Module Walkthrough Delivered Same Day
Aileen responded to a BC360 client request in the BC360 tasks-and-updates channel at 9:00AM, promising a video walkthrough for the module feature. By 4:37PM she delivered the walkthrough video with a Drive link. Same-day turnaround on a client-facing deliverable. She also provided Nick with design preferences for the WiBiz site rebuild (AutoSales, Scale360, Start, WiBiz).
Nick — Three Product Sites Live + WiBiz Rebuild
Nick shipped start.wibiz.ai, scale360.wibiz.ai, and autosales.wibiz.ai as standalone HTML builds. BC360's Butch has seen these and is keen to implement. Two WiBiz.ai rebuild versions also delivered. Nick also completed the SRI WAIPA Last Mile Build Program v1.0 and pushed corrected wave sequencing and deployment instructions for voice, email, and SMS integration.
ADK — BC360 Video Created From Nick's Assets
ADK took Nick's HTML asset directory and produced a video walkthrough, posted at 8:25PM with a Drive link. Same-day delivery after Nick's 1:37PM handoff of assets and direction.
Kim — Apexlynx Onboarding and Walkthrough Delivered
Kim posted a welcome message and walkthrough video in the Apexlynx observer channel, onboarding a new client contact and requesting feedback on workflow and operational steps. BCC credential email template also completed.
Tomorrow's Assignments
Bea
DementiaHub QA verification: complete SC-02 and SC-03 test cases and post results with screenshots to the DementiaHub thread. This is HSKD Tier 0.
Critical
Chielo
Overage billing resolution: post confirmation that billing is completed with proof (receipt, screenshot, or ledger entry). Also post Malaysia Corp Sec transfer status update with next step and date.
Critical
Kimberly
Melbourne contacted-companies report: deliver the full list of contacted companies to Nick. This is 5 days overdue. Post the file or link in the Melbourne thread with Nick tagged.
Critical
Dhanna
Post a consolidated EOD with at least one completed deliverable from assigned client ops tasks. If no tasks have been assigned, escalate to Chielo and post the escalation.
Critical
Neithan
SRI WAIPA: confirm login rate limiting implementation status and MySQL migration readiness. Post update in SRI thread.
High
Brixsonn
SRC post-audit: post status of remaining fixes with a count of open vs closed items in the SRC thread.
High
Kylie
Master Portal: post build progress update with screenshot or staging link showing current state of portal.
High
Jade
AutoSales QA: post updated test case tracker showing pass/fail status for all open cases.
High
Sergette
Harbor Point sub-account: post screenshot showing current population status and count of records entered.
High
Aileen
BCC: deliver the handover document and confirm member portal is included. Post link in BCC thread.
High
Macy
Melbourne Campaign Performance Review: compile open rates, click rates, CTA clicks, reply rates across Emails 1-4 by vertical. Post to Melbourne thread.
High
ADK
Finalize BC360 walkthrough video with voiceover, intro/outro, and CTA based on Nick's feedback. Post final version.
Normal
Lyka
PFA nurture email workflow: confirm all finalized templates are queued and ready for deployment once account is topped up. Post confirmation with workflow screenshot.
Normal