| Name | Grade | EOD | Plan Alignment | Channel Signal | Note |
|---|---|---|---|---|---|
| Aileen | B+ | Good | Off-Plan | Strong | Did BC360+Portal, skipped DH integration test |
| Eujan | Bβ | Acceptable | Drifting | Weak | Power outage blocker, 2 triage scenarios done |
| Chielo | B+ | Acceptable | Drifting | Strong | 3 devs hired. Billing check + DICT R9 not shown |
| Brix | B | Good | Off-Plan | Weak | SRC security critical fixes β website builds not touched |
| Chris | C | Acceptable | Off-Plan | Weak | DH E2E testing, not website builds. Short day. |
| Kimberly | B+ | Good | Drifting | Strong | Newsletter not done. ApexLynx billing error caught. |
| Ann | C | Poor | Drifting | None | Week 1. Vague EOD. No proof links. KOL tracker not shown. |
| Macy | C | Acceptable | Off-Plan | Weak | Zero Arcads videos. Arcads FINAL BURN DAY missed. |
| ADK | B | Acceptable | Drifting | Weak | 15 Arcads videos. Flagged possible expiry. |
| Fritzie | Aβ | Good | Drifting | None | Universe LIVE. Quotation engine not confirmed. |
| Marinelle | C | Acceptable | Off-Plan | None | Universe workflows + Melbourne tags. BC360 not touched. |
| Szich (new hire) | B | Good | N/A | Weak | GHL sub-account template build. Handle unconfirmed. |
| Amor | F | β | None | None | No EOD. No channel activity. |
| William | F | β | None | None | No EOD found. No channel activity. (szich = William?) |
Active in #hr-admin: submitted team allocation plan β Nick approved. Suggestions: assign 2 shadows for BC360 + Apexlynx continuity. Active in #internverse (Tagalog): directed new hire (szich) on WiBiz sub-account template comparison vs Aileen's build guide. Shared GitHub link for wibiz-master-portal. Responded late to Nick's website links question from 04:00 UTC.
v5.1-safety-audit. Push final passing test suite. Post tag confirmation + test results in #active-builds by 6pm. No carryover on safety items.#team-updates (05:14 UTC): "Setting up the pipeline for saving call transcripts and SOAP summaries for DementiaHub inbound calls." Single post β limited visibility.
#general: Introduced 3 new team members. #hr-admin: Full interview evaluations posted (Michael: strong backend/API, Jericho: strong initiative/adaptability, Jade: best fit per Chielo's recommendation). All 3 offered and accepted. Nick: "3 newly hired web developers joining. Onboarding tomorrow, official start Monday."
No posts in any channel beyond EOD. #active-builds had 0 messages today β Brix did not post build updates as required.
No posts in any channel beyond EOD. Short day β logged off at 6:31pm SGT, approximately 5 hours into shift.
#PropFunded thread: Coordinated brand color revisions with ADK (enforced exact hex codes from brand guide, flagged Binance liquidity reference for removal). #Apexlynx thread: Posted full meeting minutes β Apexlynx + Borderless Country Club (BCC) automation scope confirmed (fully automated booking flow, landing pages, command center, mobile access). Flagged billing error to Nick: "We followed full payment of setup feeβ¦ Chielo and I are currently fixing it."
No observable activity in any channel beyond #daily-log EOD submission.
#hr-admin: Sent Melbourne email campaign update (14:24 UTC) + Malaysia research report (13:52 UTC) responding to Nick's direct request at 10:40 UTC. #general: Welcomed new team members. No activity in #active-builds.
#PropFunded thread: Coordinating with Kim on brand color accuracy. Updated to exact hex codes from brand guide. Removed Binance Liquidity reference from statics (still present in one reel β flagged). Awaiting Kim approval.
No posts in any channel beyond EOD. Universe portal was not announced in #active-builds or #team-updates β Nick may not be aware the portal went live tonight.
No posts in any channel beyond EOD.
Reported to Aileen that 3 plan tiers already exist at agency level but no screenshots yet. Identified conflicts between what was built yesterday vs Aileen's more detailed build guide. Recommends rebuilding or patching. Proactive communication β good signal for a new hire.