🚨 DementiaHub Tier 0 DEADLINE MISSED. The week's #1 priority — DementiaHub ≥7/10 audit score and v5.1-safety-audit repo tag — was not delivered on Friday. Aileen worked on landing pages and BC360 instead. No repo tag confirmed. Eujan did DH-adjacent work (MongoDB persistence, QA video) but the remediation doc closure was not confirmed. This is a carry-forward Tier 0 item — no deferral acceptable.
⚠ #active-builds had ZERO messages today. Nick flagged this at 10:21 PM SGT in #team-updates. Eujan was supposed to post remediation doc by 5 PM, Aileen the repo tag by 6 PM, Brix+Chris the website status by 5 PM, Macy the DH client report by 4 PM, Fritzie the Universe status by 10 PM, Amor the SRC close-out by 10:30 PM. None of these were posted.
⚠ Arcads credits expired today (15 May). ~48,000 credits across the week. No final inventory or video count was posted by Macy (due 3 PM). ADK also did not post Week 20 social review. Total video production output for the week is unquantified.
ℹ BC360 billing resolved. Chielo confirmed with Butch in #hr-admin: only his card will be charged for BC360 overages. No client billing. Nick acknowledged.
ℹ DICT R9 MUA — safe to sign. Macy reviewed and confirmed. Chielo has Nick's signature. Intern capacity set to 10–20. Proceed.
✅ Forge Assessment live. Aileen deployed forge-assessment.wibiz.ai. Macy confirmed submission works. Nick needs to verify he receives copy emails.
✅ WiBiz Universe — strong progress. Chris built UNIVERSE_09-11, Fritzie built UNIVERSE_13-16, Marinelle edited UNIVERSE_00-08+. Chris and Marinelle coordinated. Universe workflow suite nearing completion.
Weekly Plan Alignment
- On Track: 0 of 14
- Drifting (plan-adjacent, wrong deliverable): Eujan, Kim, Ann, Chielo, Fritzie, Marinelle, Neithan
- Off-Plan: Aileen, Brix, Chris, Macy, ADK
- N/A (new hire, no assigned plan): Neithan, Szich
- F (no EOD, no channel): Amor
Key Channel Intel (beyond EODs)
- #hr-admin: Rich activity — DICT, Forge Assessment, BC360 billing, JWD onboarding, Wise payment planning
- #team-updates: Eujan shared QA triage video links. ADK announced power outage. Nick flagged #active-builds silence.
- #general: 3 PM SGT daily meeting confirmed live. ADK absent (power outage).
- #active-builds: 0 messages. Critical delivery channel went dark all day.
Internverse Summary
All Internverse threads (Groups A, B, C, #intern-questions, #intern-deliverables) had zero activity today. No Tagalog conversations to translate. The intern group is either not active on Fridays or shifted to other channels.
New Tasks (surfaced from channels)
- [NEW] Aileen: Forge Assessment email delivery confirmed — Nick still needs copy verification
- [NEW] Chielo: Wise Malaysia payment alternative — begin application next week
- [NEW] Macy/Chielo: DICT R9 MUA — sign, prepare tripartite template, confirm university list
- [NEW] Aileen: wibiz-forge-assessment GitHub repo access granted — maintain going forward