| Name | Grade | EOD | Plan Alignment | Channel Signal |
|---|---|---|---|---|
| Aileen | B+ | Good | Drifting | Strong |
| Chris | Aβ | Good | On Track | Weak |
| Kylie | Aβ | Good | On Track | Strong |
| Chielo | B+ | Good | Drifting | Strong |
| ADK | B+ | Good | Drifting | Weak |
| Jade | B+ | Good | Drifting | Weak |
| Lyka | B+ | Good | On Track | Weak |
| Fritzie | B | Good | Drifting | Weak |
| Neithan | B | Good | Drifting | Weak |
| Jericho | B | Good | Drifting | Weak |
| Marinelle | B | Good | On Track | Weak |
| Sergette | B | Good | Drifting | Weak |
| Kimberly | Bβ | Acceptable | Drifting | Weak |
| Macy | Bβ | Acceptable | Drifting | Weak |
| Nathaniel | Bβ | Acceptable | Drifting | Weak |
| Brixsonn | Bβ | Acceptable | Drifting | Weak |
| Bea Chrizel | Bβ | Acceptable | Off-Plan | Weak |
| Amor | C | Poor | Off-Plan | Weak |
Ana (PT QA) β not expected on Tuesday schedule.
Login returns "Details not found" for valid account #04-02. Flagged in #urgent-blockers by Kylie/szich. Brixsonn hit same error during screen recording. Blocking Meridian walkthrough video completion. Needs dev team investigation (Jericho or Neithan).
Neithan focused on NVIDIA infrastructure today. WAIPA-SRI workflows not built. Bea Chrizel's QA on hold. Thursday SRC presentation target at serious risk if workflows aren't built by Wednesday.
Chris completed WF-01 to WF-05 today. Aileen completed Phase A repo work. But external GHL/ElevenLabs config still needed, dry run not yet done. Wednesday is the plan date β Chris needs to complete remaining workflows urgently.
Corp sec was on holiday MonβTue. Chielo will follow up Wednesday. MDEC application documents are ready.
Stripe decline code "transaction_not_allowed" on Visa 4700. Macy messaged Sarfaraz β no response yet. Old Stripe branding ("My Tropical Paradise") issue resolved by Chielo.
Local Git and remote mismatch preventing full MCP/workflow integration. Blocking final WiBiz.ai GHL workflow sync.
Jericho, Neithan connected Claude Code/Codex/Antigravity to Hermes. But Aileen's Tuesday deliverable (all staff confirmed connected + evidence) was not formally posted.
11:18 AM
7:56 PM
Hermes /dashboard live (timeline, search, metrics, setup guide) + GitHub pushed. BC360/Scale360 US localization + WiBiz branding removal. Agent Dashboard redesign ~70%. DementiaHub: ElevenLabs webhooks, Agent A safety bridge, GHL writebacks, JWT security, QA docs, dry-run scripts.
AgentOS individual connections working. Dry run pending workflow completion.
DH Zoom dry run depends on Chris completing remaining workflows. External GHL/ElevenLabs config outstanding.
#hr-and-admin: posted modern dev team standards. Strong GitHub activity. Multiple tools and builds visible.
2:06 PM
9:56 PM
Complete system documentation. Custom fields/tags/pipelines verified against Dementia Manual. Missing pipeline stage added. WF-01 (Contact Init), WF-02 (Web Chat Intake), WF-03 (Staff Routing), WF-04 (SLA Breach Monitor), WF-05 (CARA Redirect) β all with live links.
In Progress β WF-06+ still needed
None
1:42 PM
9:47 PM
SRC Walkthrough Videos Γ3 (COMPLETED β Drive link). The Meridian Management Portal Walkthrough Video (COMPLETED β Drive + script links). Meridian Member Portal Script written. 21 screen recordings captured.
SRC: Complete. Meridian: In Progress.
Meridian member portal login error β "Details not found" for valid account. Posted to #urgent-blockers.
1:02 PM
9:35 PM
PropFunded Stripe payout descriptor updated to "WiBiz" (resolved "My Tropical Paradise" billing error for BC360). MDEC management profiles drafted (Selina, Leen, Nick). Admin coordination. Corp Sec on holiday β following up Wednesday.
Malaysia Corp Sec: Pending (Wed follow-up). Beeva: Not mentioned.
Corp Sec on holiday MonβTue, back Wednesday.
#hr-and-admin: Heavy β Stripe escalation, MDEC docs, PropFunded payment coordination with Nick. Multiple Nick-directed exchanges resolved same day.
12:36 PM
9:19 PM
99YSG video production (in progress, Drive folder linked). SRC Video Walkthrough support (COMPLETED, Drive folder linked).
99YSG: In Progress. SRC: Completed.
None
10:30 AM
7:07 PM
8-hr auto-logout. Monitoring Sales page (Recharts area chart, stat cards, agent table). Monitoring Agents page (bar charts, roster). Full UI redesign (design system, dark theme, Inter font, lucide-react + recharts). Portal analysis doc sent to Aileen. 3 critical code fixes identified (not yet applied).
Features: Completed. Critical fixes: Identified, pending tomorrow.
None
1:00 PM
9:20 PM
Support inbox emails answered. Influencer postings tracked. KOL tracker updated. Email marketing templates created. Attended 3 PM + 5 PM + 8:15 PM meetings. All tasks with clear before/after documented.
Support inbox: In Progress (ongoing). Others: Completed.
None
4:56 PM
11:38 PM
Non-tech workspace plan document (Google Doc shared). 4 module webhook URLs + staff invitation link embedded in universe backend. Scale360 Pro QA in progress β 2 issues escalated to Aileen.
NVidia: Pending Neithan. Webhooks: Done. QA: In Progress.
Neithan still migrating to MySQL β NVidia confirmation on hold.
11:58 AM
11:17 PM
nvidia.wibiz.ai live (Railway deploy). Hermes connected + secured. Railway Postgres migration (create/list/delete tested). Duplicate memory system removed. Clerk login: code in, app creation pending. GitHub: github.com/NLGtan/wibiz-ai-os
NVIDIA: Mostly done (Clerk pending). WAIPA-SRI: Not started.
None stated. Clerk needs app creation + domain lock.
12:38 PM
9:00 PM
Claude Code β Hermes: connected (memory, handoffs). Codex β Hermes: configured (AGENTS.md, scoped tasks). Antigravity β Hermes: connected. GHL workflow: Contact form β Wibiz_Contact_Landing pipeline + email acknowledgement (live link).
AgentOS integrations: Working. GHL workflow: In Progress.
GitHub origin sync error β local/remote mismatch.
3:00 PM
8:00 PM
As-is scenario generated for Alwee Tay + AI bot QA (GHL link). Harbor Point Health: 150 contacts created, opportunities created (GHL links). All outputs with proof.
Completed
None
1:00 PM
9:10 PM
PFA support tickets responded. Influencer contract emails + WhatsApp groups. KOL tracking sheet updated. Marketing email templates created. Email template SVG fixes. 3 PM + 5 PM + 8:15 PM meetings attended.
Completed
Email template editing slightly delayed EOD
4:00 PM
12:00 AM
5 PM meeting: priorities aligned, tasks delegated. Beeva handover to Sergette. Vamp to Lyka. PFA campaign plan submitted to Telegram (pending approval). BOGO email templates drafted for Sergette training. Onboarded Lyka/Sergette on email campaigns + PFA Discord joined.
Management tasks: Completed. PFA drafts: Not started.
Awaiting feedback on campaign plan. Was unwell earlier in the day.
3:00 PM
10:36 PM
Coordinated with Selina on 99YSG (updates pending). Sarfaraz notified of declined payment. KB training session with Lyka + Sergette (Google Drive + Doc links). MDEC status monitored. Melbourne campaign emails forwarded to Selina.
Melbourne test sends: NOT done. 99YSG: Awaiting Selina update. Sarfaraz: Awaiting response.
No PFA email drafts to QA (Kimberly didn't draft them today).
1:00 PM
9:00 PM
Scale360 Pro: "W" removed from logo. Intake form created + pipeline integration workflow (GHL link). Both tasks completed per Aileen's direction.
Assigned tasks: Completed. BC360: Awaiting direction.
BC360 direction not received from Aileen.
1:05 PM
9:09 PM
SRC Walkthrough Videos Γ3 COMPLETED (coordinated with Kylie + ADK, Drive link). Meridian workflows scanned β found facility booking not connected to GHL pipeline stages. GHL workflow link provided.
SRC: Done. Meridian: In Progress / Blocked.
Meridian member portal login error β "Details not found" for valid credentials.
12:23 PM
8:40 PM
DementiaHub QA: CANCELLED (redirected to Aileen). WAIPA-SRI QA: test doc started but on hold β waiting for updated build. QA test case document shared (Google Doc link).
DH: Cancelled. SRI: On Hold.
SRI build not ready for QA. DH scope reassigned.
9:17 PM (late)
Not reported
#team-updates: "update: fixing universe workflows" (14:44 UTC = 10:44 PM PH). Fritzie's EOD references Amor's webhooks for universe modules β collaboration visible but undocumented.
No EOD submitted
Unknown β no report